    New high-risk egg processing area

  • project duration

    16 weeks

  • projectscope

    Ventilation, air conditioning, heating, hot and cold water, and above ground drainage.

bg-shape

Challenges Faced

The project presented several challenges:

  • High-Risk Processing Environment: Addressing the specialised needs of a high-risk egg processing facility, including stringent ventilation requirements.
  • Space Limitations: Navigating space limitations to accommodate the bespoke ventilation system while ensuring optimal functionality.
  • Consistent Temperature Control: Ensuring a consistent temperature of 6 degrees within the processing facility for optimal egg handling.
  • Pressure Gradient Maintenance: Maintaining pressure gradients across various rooms for efficient processing.

Our Solution

SMS addressed the challenges with the following solutions:

  • Bespoke Ventilation Design: Developed a state-of-the-art and bespoke ventilation system tailored to the unique requirements of the high-risk egg processing environment.
  • Efficient Chilled Water System: Implemented a chilled water system powered by DX chillers to serve the air-handling plant.
  • Filtered and Conditioned Air: Distributed filtered and conditioned air to the egg processing facility through thermally adjustable swirl diffusers.
  • Pressure Stabilisation: Installed air pressure stabilisers to maintain consistent pressure gradients across different areas.
  • Stainless Steel Press-Fit Pipework: Utilised stainless steel press-fit pipework systems for new domestic services, ensuring durability and efficiency.
image
shape

sec-titleConclusion

SMS, appointed as the principal contractor, successfully delivered a bespoke ventilation system for Bumble Hole Foods' new high-risk egg processing facility in Bromsgrove. The project included efficient cooling, consistent temperature control, and pressure maintenance, showcasing our commitment to innovative solutions and client satisfaction.

The project emphasised the importance of tailored solutions in high-risk environments, efficient space utilisation, and the significance of maintaining consistent temperature and pressure for optimal processing.

The success at Bumble Hole Foods positions SMS as a preferred contractor for future projects in specialised environments, showcasing expertise in delivering bespoke ventilation solutions.

CONTACT US

conclusion image

sec-titleWhy choose us

We specialise in seamlessly delivering innovative and efficient project solutions, ensuring optimal functionality and cost-effectiveness for our clients.

sec-titleWhy choose us

We specialise in seamlessly delivering innovative and efficient project solutions, ensuring optimal functionality and cost-effectiveness for our clients.

With the dust now settling on the completion of the C-ALPS Hydrogen Laboratory research project I would now like to extend my thanks and gratitude for the success of a most challenging project. With some client changes and the impact of the various supply chain materials issues this has not phased anyone and the testament to you all is the conclusion of a great project! Your dedication and persistence has ensured that a great team ethos has been fostered in concluding the work.

Just a quick note to say thank you for a great job, the job looks great and a big part of that look is down to the hard work of your staff who performed to the highest standards. Looking forward to working with the guys again.

Speller Metcalfe - DWP Luton Project

Savesta Construction Ltd was appointed as the Principal Contractor for the new £2.10m Dining Room and Science Classrooms extension project at Moseley Park School, Wolverhampton. From the reconciliation of their quotation and throughout the construction phase we found Staffordshire Mechanical Services Ltd to be engaged and proactive. Their representatives were always happy to engage with the design and progress meetings and provided valuable contributions where necessary. Their works were completed snag free, on time, within budget and without any accidents. Their final account was detailed and transparent resulting in it being promptly agreed. Given our experience, Savesta Construction Ltd

Savesta Construction Ltd, Moseley Park School

Just a quick note to thank you for a job well done. Please pass on my thanks to your team, the feedback is very positive and it looks like nobody has been working over the Easter break, perfect! Thanks again.

Sodexo

I would like to take this moment in time to say thank you to you and your chaps. You have done a great job here at Northampton and I look forward to working with you all again.

Client for DWP Northampton Project

SMS' approach to projects is the best I have personally encountered. Their attention to detail and firm understanding of Mechanical & Electrical systems gives total confidence in project delivery and ultimately client satisfaction.

Chapman BDSP

SMS Ltd were a new Company to us, via the Diocese. They were very professional in how they worked, and were very flexible in working around our school hours and holidays. We had new heating in our nursery, and they also helped out with other water / heating problems we had been incurring for numerous years. Of which, other companies had been unsuccessful. The staff and governors at the school were so pleased with their work that they have asked to include SMS Ltd in tender / quote process for additional work in and around school.

Holly Hill Primary School, Birmingham

image

This site uses cookies to improve your experience. By clicking, you agree to our Privacy Policy.